Business Continuity Terms
Recovery Time Objective (RTO) defines the tolerable maximum length of time that a business process can be unavailable.
Recovery Point Objective (RPO) defines the maximum level of work in progress that can be lost.
Critical / Vital Records records or documents, that are irreplaceable; cause considerable inconvenience if destroyed; take considerable expense to recreate.
DR Plans should be developed in support of BCP, not separately.
Maintaining Accurate and Up to Date Hardware, Software, and Application System Inventories are critical to effective Recovery
Recovery Strategies Hot Site, Warm Site, Cold Site, Drop Ship, High Availability